Utilization and profit
Utilization Rate at an Engineering Firm: How to Calculate It, and What to Aim For
Utilization rate is the share of an engineering firm’s paid hours that go to client work it can bill. People are the largest cost a firm has, so this one number decides much of its profit, and it is often measured loosely.
On this page
Terms Used
- Paid hours: every hour the firm pays a person for in the period, holidays and vacation included unless your rule says otherwise.
- Billable hours: hours charged to client work under its contract, hourly or fixed fee. Hours that later run past a fixed fee, or are written off at invoicing, still count; that loss shows up in realization. Work the firm knows from the start it won’t bill, such as warranty, goodwill or correcting its own errors, is not billable.
- Non-billable hours: everything else: proposals, training, internal meetings, administration, waiting for work.
- Utilization rate: billable hours as a share of paid hours.
- Realization: how much of the value of those billable hours the firm actually collects. It has its own page: utilization, realization and chargeability.
The Utilization Rate Formula
The utilization rate formula divides billable hours by total paid hours, over the same period.
Utilization = billable hours ÷ total paid hours
For example, an engineer paid for 40 hours who charges 30 of them to client work that will be billed has a utilization of 75% for that week. The same sum works for a team, a department or the whole firm: add up the billable hours, add up the paid hours, and divide.
A firm-wide utilization rate is that one division, not the average of everyone’s percentages. For example, take a full-time designer at 90% of 40 hours (36 billable) and a part-time drafter at 50% of 20 hours (10 billable). The average of the two percentages is 70%, but the firm billed 46 of 60 paid hours, which is 77%. Averaging percentages gives a part-timer the same weight as a full-timer, so the firm’s number drifts away from its payroll.
Decide What Counts, Once
Arguments about utilization are often about the bottom of the division. Before you compare anyone, write down three rules and keep them:
- Which hours are paid hours. One rule counts every paid hour, holidays and vacation included, because those hours cost the firm the same. The other counts only hours available to work. Either is fine if every report uses the same rule.
- Which hours are billable. Hours charged to client work under its contract. Hours on a fixed-fee project count as billable even if the project ends up over budget, and hours written off at invoicing stay billable too; both losses show up in realization, not here. Warranty work, goodwill and corrections of the firm’s own errors go on their own non-billable codes, because the firm knows when it does them that nobody will pay.
- What happens to overtime. For example, if an engineer works 48 hours and bills 40, utilization is 83% on hours worked, or 100% on a 40-hour week. Pick one, and show overtime separately so it is never hidden inside a good number.
Write the rules on one page and attach it to the report. A new project manager, a new bookkeeper or a buyer doing due diligence should be able to rebuild the number from the timesheets without asking anyone.
How Many Paid Hours Are in a Year
The paid hours in a year depend on the working week and on what the firm gives in holidays and vacation. A 40-hour week is 2,080 paid hours a year; a 37.5-hour week is 1,950. The hours actually available for work are lower, and the gap matters most when a firm sets targets on available hours.
| Example, round numbers | 40-hour week | 37.5-hour week |
|---|---|---|
| Paid hours in a year | 2,080 | 1,950 |
| Less 9 public holidays | 72 | 68 |
| Less 2 weeks of vacation | 80 | 75 |
| Hours available to work | 1,928 | 1,807 |
The example uses Ontario’s floors. Ontario’s Employment Standards Act lists nine public holidays and gives most employees at least two weeks of vacation, three after five years (Ontario, public holidays; Ontario, vacation). Engineers and engineers in training are an exception: Ontario lists public holidays and vacation with pay among the standards they are not entitled to under the Act (Ontario, exemptions for professionals). What they get is then set by their contract or the firm’s policy, so the paid hours are the firm’s own figure, role by role.
What the Published Figures Say
| Figure | What it covers | Source |
|---|---|---|
| Just under 60% | Utilization across 896 architecture and engineering firms in the US and Canada, 2026 | Deltek, 12 May 2026 |
| 42% | Salaries, wages, commissions and benefits as a share of Canadian engineering firms’ operating revenue, 2024 (C$19.8 billion of C$46.8 billion) | Statistics Canada, table 21-10-0163-01 |
Deltek’s 47th Clarity study reported utilization “declining to just under 60%” (Deltek, 12 May 2026). It is one figure across the firms surveyed, not a target for any role. We found no public survey that reports utilization for Ontario firms alone.
The Statistics Canada line explains why the number matters so much. People are the largest cost an engineering firm has: in 2024, salaries, wages, commissions and benefits came to 42% of Canadian engineering firms’ operating revenue (Statistics Canada, table 21-10-0163-01). Every paid hour that isn’t billed is part of that cost with no fee against it.
A firm-wide average is useful for one thing: watching your own trend. It is a poor target for any one person, because roles carry very different amounts of non-billable work.
Utilization Targets by Role
Utilization targets work when they are set for each role from what that role is expected to do in a normal week. A simple way is to list the non-billable work each role owns and estimate its hours:
| Role | Non-billable work it owns | How to set the target |
|---|---|---|
| Designer, technologist, technician | Training, internal standards, some admin | Most of the week on projects; the target is the week minus those hours |
| Project engineer | Coordinating, mentoring, some proposal input | A little lower than design staff |
| Project manager | Client meetings, invoicing, resourcing, proposals | Lower again, and agreed with each person |
| Principal | Selling, hiring, running the firm | Set from the time the partners agree to spend on the business |
The point of a target is the conversation it starts. For example, a designer at 55% against a target of 85% is either short of project work, or spending time on something nobody planned. Both are worth knowing in the same week.
What One Point of Utilization Is Worth
The value of one point of utilization comes from a simple fact: the salaries are paid whether the hours are billed or not. For example, take a firm of 20 people, each paid for 1,950 hours a year: 39,000 paid hours. If 23,400 of them are billable, utilization is 60%. If the firm bills an average of $150 an hour, one more point is 390 hours, or $58,500 of fees from the same payroll.
| Example, round numbers | Amount |
|---|---|
| Paid hours: 20 people × 1,950 hours | 39,000 |
| Billable hours at 60% utilization | 23,400 |
| One more point: 1% of the paid hours | 390 hours |
| Fees for those hours at $150 an hour | $58,500 |
The same firm can also find the utilization at which it breaks even. The table is an example in round numbers: a payroll of $2,000,000, other running costs of $1,000,000, and every billable hour billed at three times its salary cost.
| Example, round numbers | 50% | 60% | 65% |
|---|---|---|---|
| Salary cost of billable hours | $1,000,000 | $1,200,000 | $1,300,000 |
| Fees at three times that cost | $3,000,000 | $3,600,000 | $3,900,000 |
| Payroll plus other costs | $3,000,000 | $3,000,000 | $3,000,000 |
| Profit before tax | $0 | $600,000 | $900,000 |
In this example the firm breaks even at 50%, and each five points above it adds $300,000. The sum assumes every billable hour is collected in full; a project that runs over its fee lowers the real figure, which is why utilization is read beside realization. The net multiplier and the overhead rate are the other two numbers in this sum.
When a High Utilization Rate Is a Warning
A high utilization rate is good news only while the hours behind it are sustainable. A team that reaches its target by working evenings is borrowing against the next quarter, and the bill usually arrives as mistakes, missed deadlines or a resignation. Deltek’s 2026 study put employee turnover at 13.8% across the firms it surveyed (Deltek, 26 May 2026), and replacing an experienced engineer takes months of recruiting and handover.
Two habits keep the number honest. First, report hours worked beside hours paid, so overtime is visible rather than buried in a strong percentage.
Second, look at the people above their target as closely as the people below it. For example, a designer at 105% for six weeks needs help as much as one at 50% needs work. Our article on keeping engineers covers the rest.
Read It Weekly, by Person
Utilization measured once a year is a history lesson. Measured weekly, by person and team, it tells you who has room for the next project and where hours are going that nobody planned. Three habits make the number trustworthy:
- Timesheets closed on the same day each week, so the number is complete. Our timesheets article covers how.
- Non-billable time coded into a handful of categories, so a low number can be explained.
- Each person sees their own number beside their target, without a league table.
A weekly reading also connects utilization to planning. If next week’s resource plan shows a technician with nothing booked after Wednesday, the low number can be fixed before it happens. Our article on resource planning explains the short weekly plan that does this.
Common Utilization Mistakes
- Averaging percentages. Add hours, then divide, as in the formula above.
- Changing the denominator mid-year. Switching from paid hours to available hours lifts every number by several points overnight, with nothing real behind it.
- Putting known unbillable work on billable codes. Warranty work, goodwill and the firm’s own corrections belong on their own codes; only hours the firm later fails to bill are left for realization to catch.
- Comparing roles with one target. For example, a project manager at 65% may be doing exactly the job; a designer at 65% may be waiting for work.
- Reading it once a quarter. By then the hours are gone, and the reasons have been forgotten.
- Ranking people publicly. A league table rewards coding hours as billable, not doing billable work.
Where Utilization Stops Being Enough
Utilization says how much of the firm’s time went to client work, not whether that work paid. A firm can be busy and still lose money. If a fixed-fee project uses twice the hours its fee allowed, every one of those hours counts as billable, and utilization looks excellent. That is why utilization is read beside realization and the project budgets. We explain the difference in utilization, realization and chargeability, and how to raise the number without longer days in how to improve utilization.
A Checklist for Measuring Utilization
- Write the three rules: paid hours, billable hours, overtime.
- Set each person’s paid hours from their contract, holidays and vacation included or not, as your rule says.
- Code non-billable time into five or six categories at most.
- Close timesheets on the same day every week.
- Report hours, not percentages, then divide: by person, by team, by firm.
- Show hours worked and overtime beside the rate.
- Agree a target with each person for their role.
- Read it every week, with next week’s resource plan beside it.
How We Approach Utilization
Utilization and capacity is part of our operation and performance work: billable time by person and team, and who has room for the next project. We start with a diagnostic: we sign an NDA, go through your timesheets, fees and invoices, and find where the hours and margin go. Then utilization by person, project budgets and unbilled work sit on one page every week, built from your own timesheets. Every suggestion comes with the figures behind it.
Questions
What Is a Good Utilization Rate for an Engineering Firm?
It depends on the mix of roles. A designer or technician spends nearly all their time on projects; a principal also sells, manages and hires. Deltek’s 2026 study of 896 architecture and engineering firms put utilization at just under 60% across the firm. Set targets by role and compare each person with their own target.
How Do You Calculate Utilization?
Divide billable hours by total paid hours for the same period. 30 billable hours out of 40 paid is 75%.
How Do You Calculate Utilization for the Whole Firm?
Add everyone’s billable hours, add everyone’s paid hours, then divide one by the other. Averaging each person’s percentage gives a part-timer the same weight as a full-timer, so the result drifts away from the payroll.
Should Holidays and Vacation Count in Total Hours?
Choose one rule and keep it. Counting all paid hours, holidays included, is the simpler rule, because those hours are paid for. What matters is that every report uses the same rule.
Are Engineers in Ontario Entitled to Public Holidays and Vacation Pay?
Not under the Employment Standards Act. Ontario lists public holidays, holiday pay and vacation with pay among the standards engineers and engineers in training are not entitled to. Their contract or the firm’s policy sets what they get. Technologists, technicians and administrative staff are covered by the Act.
What Is the Difference Between Utilization and Chargeability?
The words are often used for the same thing. Where they differ, chargeability counts every hour charged to a project, including work the firm decided in advance not to bill, such as warranty or goodwill, and utilization counts only billable hours.
Sources
- Deltek, 47th Clarity Architecture & Engineering Industry Study, 12 May 2026, read
- Deltek, Clarity A&E study launch, 26 May 2026, read
- Statistics Canada, table 21-10-0163-01, engineering services, 2024, read
- Government of Ontario, Your guide to the Employment Standards Act: public holidays, read
- Government of Ontario, Your guide to the Employment Standards Act: vacation, read
- Government of Ontario, Industries and jobs with exemptions or special rules: government employees and professionals, read
Updates
- : Rewritten at full length: the firm-wide sum, the hours in a year, what one point is worth, overtime, common mistakes and a checklist; Ontario’s rules on holidays and vacation added, and every source re-read. Two calculators added, each starting on the worked example beside it.