Utilization and profit

How to Improve Utilization Without Asking Anyone to Work Longer

Sam&Sain Co. · Published · Updated · 8 minute read

Improving utilization means turning paid hours that nobody bills into hours a client pays for, without adding hours to anyone’s week. It starts with knowing where those hours go.

On this page

Two Ways the Number Moves

Utilization is billable hours divided by paid hours, so it moves in only two ways. More of the paid hours go to client work that will be billed, or the firm pays for fewer hours that nobody bills. For a firm keeping its people, paid hours hardly change from month to month, which leaves one lasting route: turning non-billable hours into billable ones.

That takes two things at once. Hours have to be freed from work nobody pays for, and there has to be billable work ready to put them on. Freeing hours without work to fill them only creates waiting; finding work without freeing hours only creates overtime. The rest of this article covers both halves. If you need the formula and the rules first, start with how to calculate utilization.

Start with the Hours Nobody Bills

Asking people to bill more rarely works for long. It pushes hours onto the wrong codes, and the number improves while the firm does not. The lasting gains come from the other side of the sum: the paid hours that never reach a client.

Pull one month of timesheets and sort every non-billable hour into a short list of plain categories. If your codes are too loose to do that, ask each person to estimate their split for the month; a rough picture is enough to start.

CategoryWhat it usually holds
Proposals and pursuitsWriting, pricing, résumés, project sheets, interviews
Rework nobody pays forRevisions after a changed brief, corrections, extra options
Internal meetingsStaff, coordination and status meetings
AdministrationTimesheets, invoicing, filing, keying data into a second system
WaitingTime between tasks, waiting for input, approvals or a reviewer
Planned investmentTraining, standards, mentoring, business development

The last row is time well spent. Everything above it is worth questioning.

Map One Month of Timesheets

A map of non-billable time is a table with one row per category and one column per role, filled from a single month. It takes an afternoon, and it replaces a debate about whether people are busy with a list of where the hours went.

  1. Export every hour from the month: person, role, project or code, hours.
  2. Mark each line billable or not, by your firm’s written rule. Ours is in how to calculate utilization: rework the firm knows nobody will pay for goes on its own code, so it shows up here.
  3. Put each non-billable line into one of the six categories above.
  4. Total the hours by category, then by role.
  5. Write one sentence beside each large total saying what the hours were for.

Here is what the result looks like for a team, in round numbers.

Example, round numbers: one month, 12 peopleHours
Paid hours (12 people × 160)1,920
Billable hours1,100
Proposals and pursuits240
Rework nobody pays for160
Internal meetings150
Administration130
Waiting80
Planned investment60

In this example, utilization is 1,100 ÷ 1,920, or 57.3%. If half the proposal hours, 120, move to billable work, it becomes 1,220 ÷ 1,920, or 63.5%: more than six points from one category, with nobody working a longer week. The map also shows where not to start. Planned investment is the smallest row, and cutting it would save little and cost the firm its training.

The Usual Large Categories, and What Helps

Proposals

Proposals can be the largest single block of non-billable time, and the most uneven: one RFP can take a senior engineer for a week. Three changes help most. Decide earlier which pursuits to answer, with a go/no-go sheet. Stop starting from a blank page: keep project sheets and résumés current in one place, so a first draft is assembled in an hour. And give each pursuit an hours budget, tracked like a small project, so the firm can see what a win cost. Our article on AI for proposal writing covers the drafting.

Unbilled Revisions and Rework

Revisions after the client changes direction are additional services. When they are absorbed quietly, they show up as billable hours on an over-budget project, and as a loss. Write the scope and assumptions down, and raise each change when it is asked for. We cover the habits in scope creep and additional services.

Rework from the firm’s own errors is a different problem with a different fix. A drawing corrected after a late check costs more than one checked as it was drawn, so move reviews earlier: a short check at each milestone rather than one long one before issue.

Internal Meetings

Meetings grow one at a time, each with a reason, until a project engineer spends a day a week in them. List every standing meeting with who attends and how long it runs, then ask of each one what decision it makes. A meeting that only shares status can often become a written update. A single short weekly resourcing meeting can replace several project status meetings.

Administration and Keying the Same Data Twice

Hours entered in one system and typed again into another, project budgets rebuilt in a spreadsheet each month, invoices assembled by hand: none of it is visible in a single week, and all of it repeats. Linking the systems removes it for good. Our article on automation for engineering firms lists where to look first.

Waiting

Waiting hides inside other codes. For example, it shows up as a designer at 60% in a week the firm says it is busy. A short weekly resource plan reduces it: who works on what next week, and what each person needs to start. A simple ready-to-start check helps too: inputs received, approvals in hand, reviewer booked.

Planned Investment

Training, standards and mentoring belong in the budget, not in the leftovers. Give each person a planned number of hours for them, so the time is protected in a busy month and visible in a quiet one.

Put the Freed Hours on Billable Work

An hour saved on a proposal only raises utilization if it is spent on a project a client will pay for. So every change on the map needs a matching question on the plan: what will this person bill next week?

  • If there is backlog, the freed hours go straight onto it, and projects finish sooner.
  • If backlog is thin, the freed hours are capacity. The firm can take on the next project without hiring, which is worth knowing before the partners discuss a new role.
  • If the work is there but in the wrong discipline, the plan shows the mismatch early, while there is time to cross-train or subcontract.

This is why utilization is read beside the resource plan, not on its own. The same numbers tell the partners when a new hire is due; our article on growing an engineering firm covers that decision.

Fix One Category at a Time

  1. Pick the largest category that is not planned investment.
  2. Agree one change, with a person responsible for it.
  3. Compare the next month’s timesheets with this month’s.
  4. Keep the change if the hours moved; try another if they did not.

A month is long enough to see a change and short enough to keep the firm’s attention. Changing several things at once makes it impossible to tell which one worked, and the firm learns nothing it can repeat.

What Not to Do

  • Raise the target and wait. A higher number with no change behind it moves hours onto billable codes, not onto billable work.
  • Cut planned investment first. It is the cheapest row to cut and the most expensive to lose.
  • Count overtime as progress. Billable hours added in the evenings raise the number and wear out the team.
  • Hold every role to one figure. A project manager and a designer own very different amounts of non-billable work.
  • Change the rule mid-year. Switching from paid hours to available hours lifts every figure with nothing real behind it.

Watch for False Gains

Utilization can rise for bad reasons. An over-budget fixed-fee project adds billable hours without adding fees. Overtime raises billable hours without changing anything about the week. Recoding moves hours from one column to another and changes nothing on the invoice.

So read utilization beside two other numbers: each project’s hours against its fee, and overtime by person. If utilization rises while project margins fall, the gain is on paper. We explain the second number in project budget tracking and the link between the two in utilization, realization and chargeability.

Why It Matters Now

Deltek’s 2026 study of 896 architecture and engineering firms in the US and Canada reported utilization “declining to just under 60%” and operating profit falling to 16.7%, with staff growth of only 1.2% and turnover above 13% (Deltek, 12 May 2026). With few new people coming in and many leaving, the hours a firm already pays for are where its extra capacity sits.

A Checklist for the Next Three Months

  1. Month one: map a month of non-billable time by category and role.
  2. Pick the largest category that isn’t planned investment, and one change for it.
  3. Name the person responsible and the billable work the freed hours will go to.
  4. Month two: compare the timesheets with month one. Keep or replace the change.
  5. Check overtime and project margins beside utilization.
  6. Month three: move to the next category, and repeat.

How We Approach This

Our work starts with exactly this map. We sign an NDA, go through your timesheets, fees and invoices, and find where the unbilled hours go in your own records. Then we build what removes them: first drafts of proposals assembled from your past work, and time, projects, accounting and client records linked, so nothing is keyed twice. Utilization, project budgets and unbilled work then sit on one page every week, through our operation and performance work.

Questions

How Can an Engineering Firm Increase Utilization?

Find where the non-billable hours go, from your own timesheets, and remove the largest category first. Common ones are proposals, unbilled revisions, internal meetings and keying the same hours into two systems. Then make sure the freed hours go to billable work.

Is Low Utilization Always Bad?

No. Time on proposals, training and business development builds the firm. The question is whether each non-billable hour was spent on purpose.

Should We Just Raise the Utilization Target?

Not on its own. A higher target with nothing changed behind it moves hours onto billable codes rather than onto billable work. Change where the hours go first, and set the target from the result.

How Long Does It Take to See a Change?

A change in how proposals or timesheets are done shows in the next month’s numbers. Watch the trend over three months before judging it.

What if There Is No Billable Work for the Freed Hours?

Then they are capacity. The firm can take on its next project without hiring, which matters before the partners decide on a new role.

Sources

Updates

  • : Rewritten at full length: how to map a month of timesheets with a worked example, each category and its fix, putting freed hours on billable work, what not to do and a three-month checklist; Deltek’s figures re-read.

Discuss Your Project

Topic

We read every application. If we can help, the first 30-minute video call is free. Or contact us.