Scope Creep and Additional Services: Getting Paid for the Extra Work

Sam&Sain Co. · Published · 3 minute read

Scope creep is rarely one big change. It is a revision here and a meeting there, each too small to raise. Added up, they are often the difference between a project’s planned margin and its real one.

On this page

How Scope Creep Happens

Scope creep on an engineering project rarely arrives as one large change. It arrives as a third design option, an extra coordination meeting, one more site visit, a revision after the architect moves a wall. Each request is small and reasonable, and the team wants to keep the client happy, so it is done. Added up over a project, those requests are often the difference between the planned margin and the real one.

Additional Services, Defined

Additional services are work outside the agreed scope, priced separately. Common examples:

  • Redesign after the client changes the brief or an approved layout.
  • More design options, review rounds, meetings or site visits than the proposal allowed.
  • Work caused by information that was late, wrong or missing.
  • Extra phases, such as tender support or construction review, not in the original fee.

Whether something is extra depends entirely on what the proposal said. That is why the fee proposal’s scope, assumptions and exclusions matter so much.

The Habits That Get Extra Work Paid

  1. Write the limits down at the start. Number of options, review rounds, meetings and visits.
  2. Raise it when it is asked for. Before the work is done, while it is easy to price. A request agreed in a meeting is easy to price that day and hard to bill a month later.
  3. Put it in writing. A short note: what was asked, why it is outside the scope, the cost or the hours, and the effect on the schedule. Ask the client to confirm before you proceed.
  4. Keep a change log per project. Every request, its status (proposed, agreed, declined), and its value.
  5. Review the log at each milestone. With the client, so nothing is a surprise on the invoice.

Small Changes Add Up

Some firms absorb small requests as goodwill, and that can be the right call. Record them anyway, at their value, in the change log. If a project’s goodwill items reach a set amount, raise them together. And at the end of the project, the log tells you how much was given away, which belongs in the next fee for this client.

Say It in a Way Clients Accept

Clients rarely object to paying for a change they asked for. They object to finding out late. A note that says “Happy to do this. It is outside the scope we agreed, so here is what it adds: 12 hours, about $1,800, and two days on the schedule. Shall we go ahead?” is clear, polite and easy to say yes to.

See It in the Numbers

Unbilled scope shows up in two places: in the project’s hours running ahead of its percent complete, and in low realization. If a fixed-fee project is heading over, check the change log first. The cause is often there, unpriced. See tracking a fixed-fee project and realization.

Our performance work tracks hours against fee on every live project each week, so scope that grew without a fee shows up while it can still be raised.

Questions

What Are Additional Services in Engineering?

Work the client asks for that falls outside the agreed scope, priced separately: extra design options, more site visits, redesign after a change of brief, or meetings beyond the number allowed.

How Do You Prevent Scope Creep?

Define the scope, its assumptions and its exclusions in the proposal, then raise every change in writing when it is requested, with its cost and its effect on the schedule.

What Is the Difference Between a Change Order and Additional Services?

On many projects they are the same thing in different words: an agreed change to the scope and the fee. Some contracts call the consultant’s version a change in services or a fee amendment.

Discuss Your Project

Topic

We read every application. If we can help, the first 30-minute video call is free. Or contact us.