Pricing and fees
What Goes in an Engineering Fee Proposal
An engineering fee proposal offers a client a scope of work, a schedule and a fee, and, once accepted, often becomes part of the contract. The same few parts decide whether the client says yes and whether the fee holds once the work starts.
On this page
Terms Used
- Fee proposal: the document that offers a client a scope of work, a schedule and a fee. Once accepted, it often becomes part of the contract, depending on how the agreement is written.
- Scope of work: what the firm will do, phase by phase, written as tasks and deliverables.
- Assumptions: what the fee depends on: information, access, approvals and limits on reviews, meetings and visits.
- Exclusions: work the fee does not include.
The Parts, in Order
A fee proposal for a private client can be a few pages. Whatever its length, the same parts decide whether the client says yes and whether the fee holds once the work starts.
- Your understanding of the project. In a few sentences, in the client’s terms: what they are trying to achieve, and the constraints that matter to them. This is where the client decides whether you listened.
- Scope of work, by phase. What you will do in each phase, written as tasks and deliverables.
- Deliverables. What will be issued, in what form, and how many review rounds are included.
- Schedule. Durations for each phase, and what they depend on, such as client decisions or approvals.
- Team. Who will do the work and who leads it. Clients hire people.
- Fee. The amount, the method (fixed, hourly, capped hourly), and how it splits across phases.
- Billing. When you will invoice (monthly, by milestone) and payment terms.
- Assumptions. The information the client will provide, site access, the approvals path, the number of meetings and site visits.
- Exclusions. What is not included.
- Additional services. How work outside the scope will be priced, at stated hourly rates.
- Acceptance. How the client accepts, and which terms apply.
Write the Understanding First
The understanding is the part clients read most closely and firms write most quickly. It is three to six sentences that restate the project in the client’s own terms: the outcome they want, the deadline or budget that drives it, and the one or two risks they are worried about. If the understanding is wrong, the scope that follows will be too, so it is worth a short call before writing it. A proposal that opens with the firm’s history instead tells the client the firm wrote about itself first.
Scope of Work, by Phase
Write each phase as what will be done and what will be issued, with the limits beside them. A table keeps it readable:
| Example | Tasks | Deliverables | Included |
|---|---|---|---|
| Concept | Review existing information, site visit, two layout options | Concept memo and sketches | One meeting, one round of comments |
| Detailed design | Calculations, drawings, specifications | Drawings and specifications at 60% and 100% | Two rounds of comments, three meetings |
| Contract administration | Shop drawing review, site reviews, change requests | Site review reports | Six site reviews |
Every number in the last column is a limit the client has seen and accepted. When the client asks for a third layout option or a seventh site review, the proposal already shows it is beyond what the fee covers. Being paid for it still depends on the change procedure in the contract: who asks, who approves, in writing, before the work is done. Put that procedure in the proposal or the agreement.
The Sentences That Protect the Fee
Disputes about extra fees often trace back to a missing assumption or exclusion. Some examples of the kind of sentence that prevents them:
- “The fee includes two rounds of review comments on the design development drawings.”
- “The fee assumes existing drawings will be provided by the owner; field measurement is an additional service.”
- “Changes to the approved layout after the start of the construction documents phase will be priced as additional services at the rates below.”
- “The fee includes four site visits during construction.”
- “The schedule assumes the owner’s comments within ten working days of each submission.”
- “Permit and application fees are paid by the owner and are not included.”
- “The rates below apply to work performed until 31 December; later work is billed at the rates then current.”
Each one gives a future conversation about extra work a line the client has already seen; with an agreed change procedure, it becomes a change the client approves before the work. We cover the habit of raising changes in scope creep and additional services.
What to Put in the Fee Section
- The fee by phase, so a phase can be paused, cancelled or invoiced on its own.
- The method, fixed, hourly or hourly with a not-to-exceed, and what the method means for extra hours. Our article on fixed fee or hourly covers the choice.
- Expenses: which are included, and which are billed on, at cost or with a stated mark-up.
- Subconsultants: whose fee is in the price, and how the firm’s handling of them is charged.
- Rates for additional services, by role, with the date they hold until.
Check the fee against the hours before it goes in. Our article on pricing engineering work shows how to work out the lowest fee that covers the hours, the overhead and a profit.
Billing Terms Belong in the Proposal
A proposal that says “invoiced monthly in proportion to the work completed” sets a monthly rhythm the client has accepted; say which day the invoice goes out, such as the first working day of each month for the month before. One that says nothing leaves you waiting for a natural stopping point, and that wait becomes unbilled work. Say when invoices go out, what they are based on (percent complete, milestones or hours), when payment is due, and what happens to work if invoices go unpaid.
Payment, suspension, limits and change procedures are contract terms. Have a lawyer review your standard wording, and again whenever a client sends its own contract.
Exclusions Worth Listing
Exclusions depend on the discipline and the project, but some come up again and again. Consider each one, and list the ones that apply:
- Surveys, geotechnical investigation and testing, unless in the scope.
- Permit, application and review fees charged by authorities.
- Design by other disciplines, and coordination beyond what is listed.
- Redesign after an approved stage, and value engineering after tender.
- Full-time site presence, and work outside normal hours.
- Expert witness work and legal proceedings.
Keep a Library
Much of each fee proposal repeats the last one: the firm description, the team, standard assumptions, exclusions and terms. Keep those parts current in one place, so each new proposal starts from a draft and the time goes into the understanding, the scope and the fee. That is also where AI can help; see using AI to write proposals.
Public RFPs Are Different
A public RFP sets its own structure and scoring, and often asks for the fee in a separate envelope opened after the technical score. Follow its structure exactly, answer every requirement in the order it is asked, and keep the firm’s assumptions within what the RFP allows. We cover it in how to write an RFP response that scores.
Before It Goes Out
- Does the fee cover the estimated hours, at your real costs, with a margin? Check it against the overhead rate.
- Would a project manager who did not write it know exactly what is in and out of scope?
- Does every phase have its deliverables and its limits?
- Are the billing terms and the rates’ end date in it?
- Is every name, project and number in it correct for this client?
Common Proposal Mistakes
- Opening with the firm. The client wants to see its project first.
- Scope as a paragraph. Tasks without deliverables and limits can’t be held to.
- No assumptions. Without them, a change in the client’s information or schedule is not a change in scope.
- One fee for everything. A fee by phase can be invoiced, paused and changed phase by phase.
- Old text from the last proposal. Another client’s name in a proposal costs more than the time it saved.
How We Approach This
We build proposal templates, project sheets and résumés your team reuses as part of our marketing work, and first drafts assembled from your past work and project data, for your engineers to check, as part of our software work.
Questions
What Should an Engineering Fee Proposal Include?
Your understanding of the project, the scope by phase, deliverables, schedule, team, fee, billing terms, assumptions, exclusions, how additional services are priced, and how the client accepts.
How Long Should a Fee Proposal Be?
As long as the scope needs. For a private client, a few pages can hold every part; what matters is that a project manager who didn’t write it knows exactly what is in and out of scope.
What Assumptions Should a Proposal State?
The information the client will provide, site access, the approvals path, the time the client takes to comment, and the number of options, review rounds, meetings and site visits included.
Should a Proposal Show the Fee by Phase?
Yes. A fee by phase can be invoiced, paused or changed phase by phase, and shows the client what each part of the work costs.
How Is a Public RFP Response Different?
The RFP sets the structure and scoring, and often asks for the fee in a separate envelope opened after the technical score. Follow its structure exactly.
Updates
- : Rewritten at full length: writing the understanding, a scope table by phase, more sentences that protect the fee, the fee section, billing terms, exclusions worth listing and common mistakes.